trollbridge
43 days ago
|
parent
|
context
|
favorite
| on:
Major Bitcoin mining firm pivoting to AI
Couldn't foundational model training (one of the most expensive aspects of AI) be done with spare power?
rdl
35 days ago
[–]
One $4mm cabinet of GB300 can generate maybe 10-20x the power/hvac cost per hour so it doesn't make sense to ever have it idle. Vs. $100K worth of miners for the same 40KW conditioned or 100KW raw power.